Upon entering into the contract, the set of drawings and written specification is elaborated in detail to prepare for the actual build of the yacht. Depending upon the size of the yacht, the total drawing stage, from making the pre-design, takes three to five months.
This is an necessary category.
This is an non-necessary category.